MAKE AN ENQUIRY
Notice for the Spot Round First year Engg. 2026-27     Vacancy position after Round IV for First Year Engg. ACAP & IL and Important Note     FRAUD ALERT     Vacancy position after Round III for First Year Engg. ACAP & IL and Important Note     College Campus Tour.     Vacancy position after Round II for First year Engg. ACAP & IL and Important Note     Vacancy Position after Round-1 and Important Note     REVISED SCHDULE OF THE FIRST YEAR ENGINEERING FOR ACAP AND INSTITUTE LEVEL SEATS     CONSOLIDATED MERIT LIST OF IL FE 2026-27     CONSOLIDATED MERIT LIST OF ACAP FE 2026-27     CONSOLIDATED MERIT LIST INSTITUTE LEVEL (JEE BASIS)     CONSOLIDATED MERIT LIST OF ACAP (JEE BASIS)     THE OFFICE TIMING IS 10.00 A.M. TO 5.00 P.M.     Student Helpline Number : (91) 6108 2402 / 6108 2417    
Home > ISR

About

Project Beacon Is a small step to give meaning and purpose to someone's life. As it is rightly said "It costs a candle nothing to light another candle", we pledge to be the candle of inspiration and go on to light the Beacon of Knowledge.

SIES Mumbai has distributed more than 2.5 lakh masks to the frontline warriors of COVID, through the Navi Mumbai Municipal Corporation and was handed over to the commissioner Abhijit Bangar. SIES made these masks through contributions from SIES Graduate School of Engineering's Beacon Project, which employs economically challenged women in the Nerul-Vashi area.

ISR COMMITTEE

Sr. No. Name Designation Position of Committee
1 Dr. Ram Bhise Faculty H & AS Coordinator
2 Mr. Swapnil Wani Faculty CSE IOT Member
3 Mr. Kiran Thorve Faculty H & A Member
4 Mr. Sujit Patil Faculty H & AS Member
5 Mr. Perumal Electrician Member
6 Mr. Vinayak C Plumbing Lab Asst/MECH
7 Ms. Preksha Rathod Sewing and Tailoring
8 Mr. Vinod Nair AC Mechanic

 

Important Links

FACULTY LOGIN

© 2026 The South Indian Education Society. All Rights Reserved.

Maintained by MiracleworX Web Design Mumbai
TOP
Chat Icon Ask your queries
Bot Logo GST Chatbot
×